GE Sierra Construction   254.933.7337
home     profile     services     projects     references     employment     contact
 
Construction Services Design Services Building Repairs Employment Opportunities
Construction Services
For the past decade, EG Sierra has provided construction and management services on a broad range of projects.
Design Build
EG Sierra’s design and engineering capabilities and construction expertise make for a successful combination of performance based contracting and design-build capabilities.
Building Maintenance
We pride ourselves on taking projects other companies may scoff at. We treat all projects with equal importance
Employment
EG Sierra LLC is currently seeking qualified employess in several locations, please click here to read more.

Project Sampling - Current

W91151-09-C-0002
Repair Building 91027

Scope
The purpose of this project is to perform repairs to Building 91027. Repairs will include demolition of partition walls in Room 102 and 107, replacement of all flooring, exterior doors, mechanical HVAC systems, light systems, ceiling tiles, etc. Project will construct permanent walls with doors in Rooms 102A, 107A, B, C, D, E, F and G, construct two new office areas in Classroom 120, replace partitions, sinks, water closets and urinals in restrooms, complete painting of interior walls, doors and frames,
complete roofing replacement.
rule

W91151-09-C-0003
Repair Building 91026

Scope
The purpose of this project is to perform repairs to Building 91026. Repairs will include demolition of partition walls in Room 102 and 107, replacement of all flooring, exterior doors, mechanical HVAC systems, light systems, ceiling tiles, partitions, sinks, water closets and urinals in restrooms, complete painting of interior walls, doors and frames, complete electrical and roofing systems replacement.
rule

W91151-09-C-0008
Perimeter Fencing SRC

Scope
The purpose of this project is to construct a perimeter fence around the Medical SRP,PDHRA, and Traumatic Brain Injury facilities in the 42000 block. The work includes but is not limited to constructing a 6ft perimeter chain link fence with a wind screen around buildings 42003, 42004, 42005, 42006, and 42007.
rule

W91151-09-C-0014
Repair Building 91039

Scope
The purpose of this project is to perform repairs to Building 91039. Repairs will include replacement of all flooring, exterior doors, fire doors, light systems, ceiling tiles, mechanical HVAC system repairs, etc. Project will replace partitions, sinks, water closets and urinals in rest rooms, complete painting of interior walls, doors, frames, mold remediation and complete roofing replacement.
rule

W91151-09-C-0018
Renovate 1st CAV Pool

Scope
Remove existing ceilings, doors, locksets, partitions, flooring, damaged concrete,pump system, tile, diving boards and stands and bathroom accessories. Replace with new. Repaint the pool.rule

W91151-09-C-0019
Renovate 4th ID Pool

Scope
Remove existing ceilings, doors, locksets, partitions, flooring, damaged concrete,pump system, tile, diving boards and stands and bathroom accessories. Replace with new. Repaint the pool.
rule

W91151-09-C-0030
Bldg 14010 Controls

Scope
The project located at Bldg. 14010 near the intersection of Battalion Ave. and 40th St. Fort Hood TX.includes but is not limited to the removal and replacement of the failing temperature control system as follows:
1. Demo all control sensors, dampers, actuators, control valves and control panels.
2. Install new control sensors, dampers, actuators, control valves, etc.
3. Install new control panel with Lon works display in mechanical room
4. Install I-lon 600 router (or equal) in building comm. closet.
5. Install new control wiring as required to implement control sequencing as shown on the plans and to allow building control system to be integrated to the UMCS.
rule

W91151-09-C-0059
Security Fencing 5794

Scope
1. Construct new 8’ three strand chain link with barb wire fencing at the courthouse asper drawing.
2. Install 20lf dble gate.
3. Install 4” concrete drive as per plans.
4. Level, fill and compact fill for concrete as per drawing.
5. Install hydroseed 10lf perimeter of new concrete.
6. Install silt fence for construction.
rule

W91151-09-C-0067
Renovate Bldg 4622

Scope
The purpose of this project is to renovate the administrative space in building 4622. The work includes but is not limited the construction of new walls, replacement of sheetrock on interior walls,replacement of the exterior finish system, HVAC and electrical work
rule

W91151-09-C-0072
Abrams Gym Expansion

Scope
The purpose of this project is to construct a new 940 square foot addition to the Abrams Gym. The work includes the demolition of select mechanical systems and the installation of a new system to air condition the existing exercise room(B100) and the new addition. The existing room B100 shall receive new flooring,ceiling, lighting and paint. The new addition shall be constructed on a slab on grade with structural CMU walls, structural steel members and steel trusses. The interior work shall include flooring, sheetrock walls, suspended ceilings,lighting, electrical and new windows. There shall be a new 400 amp electrical panel located in the new addition and connected to a new main panel that will also be replaced in the mechanical room as part of this project.
rule

W91151-09-C-0077
Renovate Admin Space

Scope
Contractor shall provide the government 12,000 sf admin space on Engineer Drive. The space shall be located on the west side of the parking lot that facilitates buildings 4631,4633, 4634, and 4636. The building shall be freshly painted, new carpet, cleaned and all electrical, mechanical and plumbing systems in operating condition .
rule

W91151-09-C-0086
Repair Railroad Track

Scope
1. ALL Track Repair Work shall be in accordance with the UFC 4-860-03, Rail RoadTrack and Maintenance and Safety Standards dated 13 FEB 2008.
2. The contractor shall elevate to level and re-tamp approximately 95,000 linear feet of various rating standard gauge existing railroad track.
3. The contractor shall re-gauge approximately 675 linear feet of 115 lbs/ yd rail by removing the existing track spikes, plugging the old spike holes and re-spike with new track spikes. The gauge of the rail must be brought into the specification called for in the UFC 4-860-03 dated 13 FEB 2008.
4. The contractor shall restore and repair by welding 8 existing Frogs to ensure frog points and frog tread surfaces are within specification tolerances as described in Table 8-1 of the UFC 4-860-03 13 Feb 2008.
5. All track repair work shall be subject to inspection and validation by the Fort HoodTrack Inspector and DPW COR.
6. The contractor shall not perform work within 25LF of the BNSF Railroad Line.
7. The contractor shall clean, adjust and lubricate all 31 switches the tamper passes through.
rule

W91151-10-C-0041
Perimeter Fencing

Scope
The Contractor shall secure the perimeter around buildings 42003, 42004, 42005, 42006 and 42007with a security chain link fence, and seal all doors and windows in accordance with the project scope,construction drawings, plans and specifications. The contractor shall also seal all doors and windows in accordance with the drawings.
rule

W91151-10-C-0076
Provide Office 278 & 279

Scope
The purpose of this project is to construct new offices in buildings 278 and 279 per the attached drawings. Project also includes adding batt insulation above the ceiling and additional layer of sheetrock to walls as shown on attached drawings to limit noise transfer. Contractor shall construct ADA ramp from south parking lot to west side of Bldg 278.
rule

W91151-10-C-0081
Repair KOS Site

Scope
The purpose of this project is to perform repairs to the Kids on Site (KOS) building at the ResiliencyCampus. The work includes but is not limited to installation of fire alarm, fire sprinkler, repair of architectural finishes to include flooring, paint, ceiling tiles and install child sized water closets and lavatories.
rule

W91151-10-C-0140
Construct 16th Street PT Track

Scope
The purpose of this project is to construct a PT track and obstacle course located on 16th Street and Battalion. The area shall include a parade field with canopy, 10 wooden obstacles and quarter-mile running track.
rule

W91151-10-C-0141
Construct Clear Creek PT Track

Scope
The purpose of this project is to construct a PT track and obstacle course located on south of building 42000 on Clear Creek and Battalion. The area shall include10 wooden obstacles and quarter-mile running track.
rule

W91151-10-C-0165
Construct Confidence Course

Scope
The purpose of this project is to construct obstacle course as per plans and specifications.
rule

W91151-10-C-0174
Install Water Main Near 91073

Scope
The purpose of this project is to install a new 10" underground water line north of building 91073.
rule

W91151-10-C-0193
Construct Modular Facility Site Prep

Scope
This project includes the site preparation needed for the installation of a modular facility, to be installed by others. This project includes the following trades: dirt work, exterior utilities, exterior improvements, and minor modifications to the existing facility.
rule

W91151-10-C-0195
Renovate Building 42007

Scope
The purpose of this project is to install new communications and additional office space in building 42007.
rule

W91151-10-C-0197
Construct Archery Range & Climbing Tower

Scope
The purpose of this project is to construct a new Air Assault Climbing Tower and Archery Range complete with security fencing.
rule

W9126G-09-C-0067
Convert Building 91073

Scope
The project includes converting the previous West Fort Hood fitness center to battalion headquarters for 504th MI. The facility will support approximately 75 personnel. The project includes adding a second floor to the basketball court area. There will be 40 office set ups on each floor in the main areas and 10 offices will be added to the first floor.The exterior block walls will be sealed and repainted.

The exterior walls will be fur out and spray in foam insulation placed. New windows will be added throughout the building in accordance to ATFP standards. The architectural finishes of the building shall be replaced or repaired to include the flooring, wall coverings, base board and ceiling finish. A new fire protection system will be installed including a wet pipe fire sprinkler system, fire alarm and all emergency and egress lighting and hard ware.

The fixtures in the latrines will be replaced with low flow fixtures. Replace the HVAC system, install a new chiller, air handler and ductwork.The electrical panels shall be replaced; circuits will be rerun to provide for existing and new offices. New energy efficient lighting in accordance with IES standards will be added along with motion detector switches to all offices. Two rooms for NIPR and SIPR will be constructed.The gutters shall be replaced and a KNOX box will be installed to the exterior of the facility.

"Our success is largely based on our reputation for outstanding performance. Our projects are awarded to us because of this performance, and virtually all of our clients are brought to us by recommendation from existing clients."

Contact GE Sierra
   p. 254-933-7669
   f. 254-933-2024
   w. contact form
Employment Opportunities
   Click here for
employment opportunities
News & Updates
   Click here for
EG Sierra LLC news

 

 

 


©2010 EG Sierra L.L.C. All rights reserved      home        profile        services        projects        references        employment      contact